Find the change order while it’s still a redline.

Centauri reads your drawings, models, and specs, then flags what will bite you in the field.

Every problem you catch in pre-con costs a fraction of the same problem in the field.

~70%

of rework traces to design and engineering errors

~5%

of project cost lost to field rework (range 2-20%)

~800 RFIs

per project, about $1,080 each, mostly design and field misalignment

Find it, qualify it, package it

Centauri watches the tender sources and the open web, scores each pursuit against your own history, and builds the scope straight from your documents.

Bid leveling

Bids in different formats normalized to the same line items.

Scope gaps & exclusions

The carve-outs that become change orders pulled to the top.

Award recommendation

A defensible pick based on leveled price plus completeness.

Buyout to budget

Awarded scopes roll toward commitments and budget.

Pursue the winnable work

Every relevant opportunity, found and scored before your competitors are even looking.

Centauri hunts the sources

Watches the tender sources and the web, and brings you the opportunities that fit your book of work.

A winnability score

A pursuit pipeline

Pursuit pipeline

This week

Qualifying

3

Transit depot expansion

Public · $18M

Hospital wing fit-out

Private · $9M

Bidding

2

Water treatment upgrade

Municipal · $24M

78

Win score

Bridge rehab · Hwy 40

Public · $12M

Submitted

1

Data centre shell

Private · $31M

9 new opportunities this week

🏗

Concrete & formwork

Div 03

Slab-on-grade · L1

📐 A-201

📄 03 30 00

Suspended slabs · L2–L4

📐 A-203

📄 03 30 00

Shear walls · core

📐 S-110

📄 03 20 00

Issue to vendors

Packaged from the documents

Scope packages built from the drawings and specs, not from scratch.

Drawing- and spec-driven: the package is assembled from the relevant sheets and spec sections.

Trade-ready scopes: organized by trade so vendors bid exactly what you intend.

Traceable: each scope line links back to the drawing and spec it came from.

Compare like for like

When the bids come back, Centauri levels them and flags what's missing.

Bid leveling

Bids in different formats normalized to the same line items.

Scope gaps & exclusions

The carve-outs that become change orders pulled to the top.

Award recommendation

A defensible pick based on leveled price plus completeness.

Buyout to budget

Awarded scopes roll toward commitments and budget.

Bid leveling · Concrete

3 vendors

LINE ITEM

MERIDIAN

NORTHGATE

VERTEX

Slab-on-grade

$0.84M

$0.79M

$0.88M

Suspended slabs

$1.10M

$1.02M

$1.15M

Shear walls

Not bid

$0.33M

$0.31M

Exclusions

Rebar

None

Pumping

Recommend Northgate · $2.14M · full scope

Works with the tools you already run.

Centauri finds and scores the work, then works with the pipeline your team already keeps.